PENTA COMPLETIONS
COMPLETE ROD PUMPING OPTIMIZATION, DESIGN & SERVICES
DESIGN OR DYNAMOMETER INPUT DATA SHEET  
       Customer Information  
    Company Name:   Date:  
    Location & Field:            
    Contact:            
    Phone: Fax:        
    Email:        
    Field Contact: Phone:    
    Purpose:  
       
    Completion Details  
    Elevation: KB GL KB - GL Deviated  
    Well Depth: TD PB       Survey?  
    Perforations (Open Hole)                             From: To:        
    Anchor Packer Set @        
    Gas Separator: Type        
                         
    Rod String (if applicable)  
    Section Count Meters Feet Dia. (mm) Grade Mfg. Guides
Surface Casing   Polish Rod
Size (mm) 2
Wt. (kg/m) 3
Set @ (mKB) 4
    5
 Production Casing   6
Size (mm) 7
Wt. (kg/m) Total Length
Set @ (mKB) Bottom Hole Pump (if applicable)
    API Designation MPS cm    
Tubing   PSN Type Landed @ m    
Size (mm) PUMPING UNIT (if applicable)
Wt. (kg/m) Manufacturer API Designation    
Set @ mKB Crank Hole (x of y) Measured Stroke   G.B. Ratio
    Rotation CW CCW   Speed SPM
                       
    Counter Balance Weight Description & Position
      Master Weights   Position Auxiliary Weights Crank Description
    Right Leading      
    Right Lagging       CBE
    Left Leading       SUB
    Left Lagging            
    Unit Sounds Balanced Over Under      
    PRIME MOVER (if applicable)
    Manufacturer Type Size Conn. HP
    Sheave Sizes (in) Motor Unit Jackshaft: In Out
    TARGET PRODUCTION OR PRODUCTION TEST
Perforations:   Test Date          
Open Hole M3D Oil M3D Water M3D Total Fluid GOR
    RESERVOIR DATA
P.S.N. Producing Zone Static Pressure Mpa BH Temp. C
    Solution GOR @ Bubble Point MM3/M3 Formation Volume @ Bubble Point
    Oil Gravity (API) Water S.G. Bubble Point Mpa  
    Tubing Pressure kPa Casing Pressure kPa Presco Activated
PB Pressure Test From kPa To Kpa    In: min.
TD                    



UPLOAD DEVIATED SURVEY FILES